May 31/13: Finland. A $34.2 million contract modification for initial development of the Precision Targeting Module software package brings total funds committed to $39.3 million to provide key items for Finland, upgrade and expand Pike County Operations at the JASSM AUR building, and provide general JASSM systems engineering services. Deliverables for Finland include 1 containerized instrumented JASSM test vehicle, 1 containerized Jettison test vehicle, 2 containerized separation test vehicles, 2 containerized mass simulation vehicles, global positioning systems controlled radiation pattern antennas, 1 weapon support simulator consisting of a system support simulator and transit case assembly, and tooling, along with various forms of support (FA8682-11-D-0155, #0022 modification 04).
Work will be performed at Orlando, FL and Troy, AL, and is expected to be complete by Jan 31/16. USAF Life Cycle Management Center/EBJK at Eglin Air Force Base, FL manages the contract.
Dec 3/12: Integration. Lockheed Martin
announces a $5.1 million initial contract to support integration of the AGM-158 JASSM onto Finnish Air Force (FiAF) F-18C/D Hornets. It’s the 1st phase of a 6-year software development and aircraft integration support program, with additional contract awards expected for the remaining phases of integration support, missile procurement and post-production support. For convenience and economies of scale, the award aligns with the FY 2012 JASSM Production Lot 10 procurement contract.
Finland becomes the 2nd international customer for JASSM, whose integration will coincide with the FiAF’s F/A-18 Mid-Life Two upgrades. The U.S. Navy will lead the integration effort in coordination with the U.S. Air Force, Lockheed Martin and the FiAF. Integration activities will take place at the Naval Air Warfare Center Weapons Division in China Lake, CA.
Tuossahan tuo on mainittu mitä pitää sisälläsä eli ohjelmisto kehitys ja tuki 5milj taalaa... Ei kovin paha hinta ja siis kaikkiin hornetteihin...