The Indian Air Force (IAF) has expressed concerns to Russia over technical problems and delays plaguing the USD10.5 billion Fifth Generation Fighter Aircraft (FGFA) programme, which is based on the Russian Air Force's Sukhoi T-50 PAK-FA platform.
Official sources told IHS Jane's that the IAF's primary objections to fighter's preliminary design features included the inadequacy of its AL-41F1 engines, its stealth features and its weapons carriage system.
Differences also emerged over the operational capability of the Byelka active electronically scanned array (AESA) radar. Additional IAF concerns include the overall development cost of the aircraft, its maintainability and safety features, the sources said.
As a result, in recent months the IAF has significantly reduced the number of FGFA aircraft it plans to acquire from around 220 to 130-145. It has also dropped its requirement for 45-50 twin-seat FGFA trainers as Russia had demanded an additional USD1 billion and extended deadlines for their development.